Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6114
Project Management - Aquiles Carattino
A person is faced with the challenge of rolling back

After a Failure, Revert to the Last Known Working State

Both long and short-running projects will, at some point, face a failure. Sometimes it is possible to plan around them or include them as part of a risk management and mitigation program. Sometimes, however, failures appear unexpectedly, bringing an entire project to a halt and perhaps challenging its continuity.

Read More »